“My experiences with CD Hall Construction have been outstanding each and every time I’ve used them on a project. What sets them apart from other companies is their can-do attitude, knowledgeable office and field staff, and proper manpower/equipment needed to get the job done right the first time/on time.”
– BOA General Contractor
Project Highlights
Completed: July 2012
Work restricted to bank off-hours only
Installed sidewalk, ramps, and concrete pavement to satisfy ADA requirements
Job featured 120 LF of trench drain installed through new and existing pavement
Job completed in a single weekend showcasing speed and precision
CD Hall was immediately established as a preferred BOA contractor and has provided multiple ADA renovations since