Bank of America ADA Renovation

Project Location

Henrico County, Virginia

Project Description

Exterior Renovations to Satisfy ADA Requirements

Project Highlights

  • Completed: July 2012
  • Work restricted to bank off-hours only
  • Installed sidewalk, ramps, and concrete pavement to satisfy ADA requirements
  • Job featured 120 LF of trench drain installed through new and existing pavement
  • Job completed in a single weekend showcasing speed and precision
  • CD Hall was immediately established as a preferred BOA contractor and has provided multiple ADA renovations since

“My experiences with CD Hall Construction have been outstanding each and every time I’ve used them on a project.  What sets them apart from other companies is their can-do attitude, knowledgeable office and field staff, and proper manpower/equipment needed to get the job done right the first time/on time.” – BOA General Contractor